AI can produce a solid first draft from P&IDs, OEM documents and standards, which is useful for new assets where there is no operating history to write…

AI can produce a solid first draft from P&IDs, OEM documents and standards, which is useful for new assets where there is no operating history to write from and no existing procedure to adapt. The P&IDs show the equipment and flow paths, the OEM manuals cover startup and maintenance requirements and the standards set the rules the procedure has to follow, so AI can pull those together into steps that a team then reviews and adjusts.

Each source contributes something different to the draft, and the value comes from combining them rather than reading any one of them in isolation. The P&ID tells you which valves sit between a pump and a vessel and therefore which ones need to be closed for an isolation, the OEM manual gives the warmup times, limits and checks the vendor expects and the applicable standards add requirements such as permits, gas testing or verification steps that a vendor manual will not mention.

The draft is a starting point and not an approved procedure, since things like site layout, crew practice and lessons from commissioning only show up once the asset is running. A P&ID will not tell you that a valve is awkward to reach from the platform, that two crews need to coordinate on a step or that a vendor recommended sequence causes a pressure spike on this particular system, and those details are often what makes a procedure safe and workable.

The review should be done by people who will operate or maintain the asset, ideally with the source documents beside the draft so each step can be traced back to where it came from. Drafts should be treated as provisional through commissioning, with the expectation that they will be revised as the team learns how the plant actually behaves, and that revision process should be planned rather than left to happen informally.

What it saves is the blank page, which on a new facility can mean hundreds of procedures that would otherwise be written from scratch. Engineers who would have spent weeks assembling basic steps from manuals can spend that time on the site specific judgment that a draft cannot provide, which is where their experience matters most.