Back to Blog
Blog

How do you visualize active permits and procedures on the same asset?

How do you visualize active permits and procedures on the same asset?

Permits and procedures are usually managed in separate lists, so nobody can easily see that a piece of equipment has two active permits, a procedure in…

Permits and procedures are usually managed in separate lists, so nobody can easily see that a piece of equipment has two active permits, a procedure in progress and an open work order at the same time. Permits might live in a permit to work system or on a board in the control room, procedures in a document system or on clipboards in the field and work orders in the maintenance system, and each of those has its own view organized by number or date rather than by the equipment involved.

That combined view is exactly what a supervisor or permit coordinator needs before approving more work. Without it, the coordinator has to piece the picture together by checking several systems and asking around, and under time pressure that step gets shortened, which is how two crews end up working on the same line with different assumptions about its state. Someone approving a hot work permit needs to know whether an isolation on the same equipment is about to be removed or whether a procedure nearby is about to vent gas, and those facts usually sit in a different list.

Showing them on the asset in a digital twin solves this, since the coordinator can click on equipment or an area and see everything active there. Each permit, procedure and work order is tied to the equipment tags it covers, so the twin can mark equipment with active work, and selecting a piece of equipment brings up everything currently open on it. Zooming out to an area or unit shows the density of work, which helps with spotting congested areas where more jobs should not be added without a closer look.

The view is only as good as the tagging behind it, so permits and procedures need to reference equipment consistently, using the same tags that appear on the drawings. Free text descriptions like “pump near the north stairs” cannot be placed on a model, and permits that cover a broad area need to be linked to that area rather than to a single item. Status also needs to be current, since a permit that was closed on paper but not in the system will show up as active and wear down trust in the view.

This is a core part of how Interface uses the site model, with live work shown where it is happening rather than in separate systems. For a coordinator the practical difference is that knowing what else is happening on a piece of equipment becomes something they can answer from one place in seconds, rather than through a round of phone calls and system checks before every approval.