Acknowledgment works best when it is tied to the job instead of a separate email or training record. When an operator opens a procedure that changed since the last time they ran it, they should see what changed and confirm it before they start, which puts the acknowledgment at the moment it actually matters.
Most sites handle revisions by sending a notification when a procedure is approved and asking everyone affected to read and acknowledge it within a set period. The problem is that the procedure may not be run for weeks or months after that, by which time the operator has dealt with dozens of other emails and the specific change has faded, and some people on the distribution list may never run that procedure at all.
A sign off collected weeks earlier only tells you someone clicked a link, not that they had the change in mind when they did the work. Tying acknowledgment to the job means the operator sees a short summary of what is different, ideally highlighted on the steps that changed, and confirms it as part of starting the procedure, so the record shows the acknowledgment and the execution together under the same name and time.
The acknowledgment should be specific to the person and the revision, so an operator who has already run the new version does not see the same prompt every time, while someone returning after leave or a rotation does. It also helps to keep the summary short and focused on what the operator will do differently, since a long list of editorial changes trains people to click through without reading.
Even an acknowledgment at the right moment is not the same as proof that someone understood the change, which is a separate question about knowledge checks that we cover in another post. For significant revisions, such as a changed isolation sequence, sites often pair the acknowledgment with a briefing or a short check, and the acknowledgment at the job then serves as the final reminder at the point of work.