The person needs to confirm that the drawing matches what is actually in the field, that every energy source has been identified, including electrical, hydraulic, pneumatic and stored pressure, and that the isolation points suggested are physically accessible and lockable. Drawings are often out of date, and an AI working from a wrong drawing will produce a confident but wrong answer. The suggestion will look complete and well organized either way, which is exactly why the checking cannot be a quick glance at a list.
Confirming the drawing against the field means walking the system, or at least the parts of it that matter, and checking that each valve exists, sits where the drawing says it does and is the type the drawing shows. Modifications that never made it onto the P&ID are a common source of trouble, such as a bypass added years ago, a tie in to another unit or a small bore connection for an instrument, and any one of those can leave a path for energy to reach the work area.
Identifying every energy source goes beyond the process lines on the P&ID, since electrical supply to motors and heaters, hydraulic and pneumatic actuators, springs, pressure trapped between valves, heat and gravity can all cause harm and may not appear on the drawing the AI used. The person also needs to check that each suggested point can actually be reached, operated and locked, since a valve with no lockable handwheel, a valve high on a rack with no access or one that is known to pass is not a reliable isolation whatever the drawing says.
They also need to check that the isolation meets the site’s own standard, such as double block and bleed where it is required. Site standards often set the type of isolation by the hazard, the pressure, the fluid and the type of work, so a single valve may be acceptable for one job and not for another on the same line, and the AI suggestion may not reflect those distinctions. The person should also confirm how the isolation will be proved, which means identifying the drain or vent points and the test that shows zero energy.
The AI can speed up the planning, but verification in the field by a competent person is still the step that makes the isolation safe. That verification should be recorded with the same care as any other isolation, showing who checked each point and when, and any differences found between the suggestion and the field should be fed back so the drawing gets corrected and the next suggestion starts from better information.
