Empower Every Operator in the Field

Interface's Mobile Operations platform bridges the gap between corporate systems and frontline execution, giving operators digital procedures, AI-powered verification, and real-time feedback, from any device.

The Field Is Disconnected

Disconnected Systems

Operators rely on paper binders and static PDFs, disconnected from real-time updates and unable to capture field data digitally.

Delayed Updates

Corporate procedure changes take weeks to reach the field, creating gaps between what is approved and what is executed.

No Feedback Loop

Deviations, observations, and equipment issues go unreported or are lost in paperwork with no path back to corporate.

Instant Digitalization

No more months-long manual conversion. Interface ingests your paper-based procedures and deploys field-ready digital workflows in minutes.

Ingest
Parse & Structure
Human Performance Enhancements
Deploy to Field
01 - Ingest
Wellhead Inspection Procedure
48 steps · Rev 3 · Upstream
SOP
Pre-Startup Safety Review
24 items · Critical safety gate
Checklist
Hot Work Permit Application
Approval workflow · 6 signatories
Form
Emergency Shutdown Sequence
32 steps · ESD-Class A · Rev 5
SOP
Confined Space Entry
18 items · Gas test required
Checklist
Lock-Out / Tag-Out (LOTO)
OSHA 1910.147 · All units
Policy
AI-Enabled Document Ontology
02 - Parse & Structure
SOPWellhead Inspection Procedure
Extracting steps & structure48 steps identified
Linking equipment tags12 tags mapped
Mapping role assignments3 roles assigned
Cross-referencing standards6 references linked
Fully Structured
48 steps · 12 equipment tags · 3 roles · 6 references
03 - Human Performance Enhancements
Human Performance Standards CheckHPOG
Step Clarity
All steps use explicit action verbs
Ambiguous instructions are the leading cause of field execution errors. Clear verbs reduce misinterpretation by 60%.
Caution Placement
Warnings precede hazardous steps
OSHA requires hazard warnings before the associated step. Incorrect placement has been cited in 23% of incident reports.
Level of Detail
Step 14 needs specificity - auto-corrected
Vague pressure range "normal" replaced with "150–200 PSI" per equipment spec sheet EM-4218-R3.
Checkoff Format
Sign-off boxes at critical hold points
Hold points ensure independent verification before proceeding to irreversible operations.
Dual Verification
Independent verification steps present
Two-person verification at safety-critical steps reduces human error rates by an order of magnitude.
4 of 5 passed1 auto-corrected
04 - Deploy to Field
Ready for FieldHPOG Verified ✓
Wellhead Inspection Procedure
48 steps · SOP-4218 · Rev 3
1Verify pressure gauge reads 150–200 PSI
2Inspect wellhead flange for leaks or corrosion
3Check hydraulic system for rust marks or missing clamps
4Confirm emergency shutdown valve is accessible
5Record ambient temperature and wind conditions
+ 43 more steps
Field Operators
12 jobs assigned
Supervisors
3 reviews pending
Control Room
Live monitoring

Step-by-Step Field Execution

Operators access the latest approved procedures on any device - with offline-first support, step-by-step guidance, and real-time progress monitoring for supervisors.

Offline-first access on mobile and tablet
Step-by-step guidance with equipment tags
Real-time supervisor monitoring dashboards
Procedures auto-update when corporate approves changes
Procedures
525 procedures
202 Boiler FD Fan 31-Kt-212 Turbine ShutdownCompliant
Utility Boilers · ShutdownIn Hand
202 Boiler FD Fan Lube Oil System StartupCompliant
Utility Boilers · StartupIn Hand
202 Boiler Id Fan 31-Kt-215 Turbine ShutdownCompliant
Utility Boilers · ShutdownIn Hand

Verify Conditions in Real Time

Operators capture photos and videos of equipment conditions. Interface's AI analyzes the content to verify compliance, detect anomalies, and flag issues before they escalate.

AI image analysis for equipment condition verification
Automatic anomaly detection (rust, leaks, missing components)
Photo evidence linked directly to procedure steps
Instant pass/fail verification with detailed reasoning
35%Reduction in unplanned deviations
Batch Mixer Operations
Batch Mixer ChecklistStep 12 of 12, 11 completed
Check hydraulic system for rust marks, leaks or missing clamps.
Capture MediaAdd Comments
Verify Condition
‹ Previous12 / 12Next ›
Captured
Analyzing image…
FAILED: Visible rust marks and corrosion are present on the plumbing. Recommend addressing before proceeding.
Notify Supervisor

Close the Loop Between Field and Corporate

Every field observation, deviation, and comment is captured digitally and fed back to corporate systems in real time, creating a continuous improvement cycle.

Field observations route directly to corporate dashboards
Deviation reports trigger automatic procedure reviews
Equipment issues create maintenance tickets instantly
Complete audit trail from field execution to corporate action
Field Operator
Wellhead Inspection
Inspection ChecklistStep 6 of 12
Inspect flange connections for visible leaks or corrosion.
Capture MediaAdd Comments
Report Deviation
Deviation Report
Type
Equipment Condition
Severity
High
Description
Flange on valve T-204 showing active corrosion and minor seepage. Recommend immediate maintenance.
Submit Report
Sent to Supervisor
‹ Previous6 / 12Next ›
Supervisor Dashboard
app.getinterface.ai/dashboard
Deviations
Procedures
Reports
Teams
Active Deviations
NEW
Valve T-204 - Active Corrosion
Wellhead Inspection · Step 6 · High Severity
Flange showing active corrosion and minor seepage. Operator recommends immediate maintenance.
Accept Deviation
Reject
Deviation Accepted - Maintenance ticket #4821 created
Case Study

Proven in the Field

Interface mobile SOP deployment

Digitizing 10,000+ Procedures for a Major Refinery Operator

A leading North American refinery operator partnered with Interface to replace paper-based SOPs across 14 operating units. Within weeks, field operators had step-by-step digital procedures on their devices - with offline access, real-time deviation reporting, and AI-powered verification at every critical step.

10,000+Procedures digitized
35%Increase in wrench time
15%Decrease in non-productive time
45%Reduction in deviations
14Operating units
3 weeksTo full deployment

Empower Every Field Operator

Give your crews the right procedures, inspection checklists, and AI-powered verification, online or offline, at every job site.

See Field Operations in Action